overhaul. The staff should carefully check all the equipment systems in the Prefab House Container on a regular basis (once a week), to ensure the normal operation of the equipment in the Prefab House Container, and deal with any faults in time to avoid affecting the entire set of equipment in the Prefab House Container due to a piece of equipment failure For the normal operation of the container, the staff should close the equipment inspection door of the Prefabricated House container in time after completing the work, so as to prevent the normal operation of the equipment from being affected by wet weather such as rain, snow and fog.
Hoisting. During the hoisting process of the Prefab House Container, the hoisting rod at the bottom of the bilge should be lifted slowly. Pay attention to the balance of the engine room, and check whether the position of the sling is appropriate. If it is unbalanced, adjust the position of the sling in time to ensure that the pod is in a balanced state, and then complete the hoisting. Note that the staff should be at a safe distance during hoisting to avoid hoisting mistakes injure staff.
maintainance. Operators should pay attention to the insulation wall panels and bottom panels in the cabin, and place the tools in place in time for regular maintenance and equipment overhaul of Prefab House Containers to avoid major impact damage to prefabricated housing containers; the external anti-corrosion paint of the cabin should be done by industrial personnel. Regular repairs to extend the anti-corrosion life of the container body of the prefabricated house.
The prefabricated house container is a prefabricated house container, which is a complete set of electrical equipment, and the prefabricated house container substation is a complete set of power supply and distribution system, including the cabin and electrical equipment.
Сэтгэгдэл
(0)